EFL Details (FP-24)
Detail drawings are used on a continuing basis within each division to clarify the work required in the plans. EFLHD Detail Drawings are arranged by FP section.
The drawings are available in MicroStation (DGN) and Acrobat (PDF) formats.
Note: Use these drawings for FP-24 projects. See the FP-14 EFL Details for drawings to be used on FP-14 projects.
Jump to Section: 252 – 604 – 610 – 619 – 629 – 635 – 636
| 157 | Soil Erosion and Sediment Control | Date |
|---|---|---|
E157-01 | Stabilized Construction Exit | 5/2024 |
E157-02 | Wire-Backed Silt Fence | 5/2024 |
E157-04 | Fiber Roll | 5/2024 |
E157-06 | Check Dam with Rolled Erosion Control Product | 5/2024 |
E157-08 | Temporary In-Stream Diversion Berm Methods | 10/2025 |
E157-09 | Bypass Pumping Diversio For Temporary In-Stream Diversions | 10/2025 |
E157-10 | Sediment Filter Bag | 5/2024 |
E157-11 | Floating Turbidity Curtains | 5/2024 |
< Section Start | Top
| 204 | Excavation and Embankment | Date |
|---|---|---|
E204-01 | Cut and Fill Slope Transitions | 5/2024 |
E204-02 | Benching for Embankment | 5/2024 |
E204-05 | Roadway Connections | 5/2024 |
| 251 | Riprap | Date |
|---|---|---|
E251-01 | Placed Riprap at Culvert OutletsNote: 2 sheets | 5/2024 |
E251-02 | Placed Riprap at Culvert Outlets | 5/2024 |
| 252 | Rockery, Special Rock Embankment, and Rock Buttress | Date |
|---|---|---|
E252-01 | Mechanically-Placed Rock Embankment | 5/2024 |
| 401 | Asphalt Concrete Pavement by Gyratory Mix Design Method | Date |
|---|---|---|
E401-01 | Pavement Transitions | 5/2024 |
| 414 | Asphalt Pavement Crack and Joint Sealing and Filling | Date |
|---|---|---|
E414-01 | Asphalt Pavement Crack Sealing and Filling | 5/2024 |
| 602 | Culverts and Drains | Date |
|---|---|---|
E602-01 | Metal Pipe Culvert | 5/2024 |
E602-07 | Concrete Pipe Culvert Installation | 5/2024 |
E602-08 | Elliptical Concrete Pipe | 5/2024 |
E602-09 | Elliptical Concrete Pipe Culvert Installation | 5/2024 |
E602-10 | Concrete End Section for Elliptical Concrete Pipe | 5/2024 |
| 604 | Manholes, Inlets and Catch Basins | Date |
|---|---|---|
E604-01 | Inlet, Type 4A, 4B, and 4C | 5/2024 |
E604-02 | Inlet, Type 4DNote: 2 sheets | 5/2024 |
E604-03 | Inlet, Type 5A Modified | 5/2024 |
E604-04 | Inlet, Type 5B | 5/2024 |
E604-05 | Inlet, Type 6A | 5/2024 |
E604-06 | Inlet, Type 6A-6 & Metal Frame and Grate (Curved Vane Grate)Note: 2 sheets | 5/2024 |
E604-07 | Junction Box | 5/2024 |
E604-08 | Spring Box | 5/2024 |
E604-09 | Precast Concrete Inlet Cap | 5/2024 |
< Section Start | Top
| 605 | Underdrains, Sheet Drains, and Pavement Edge Drains | Date |
|---|---|---|
E605-01 | Underdrain For Pavement and Ditches | 5/2024 |
E605-02 | Underdrain For Fill Slopes | 5/2024 |
E605-03 | Underdrain For Cut Slopes | 5/2024 |
| 608 | Paved Waterways | Date |
|---|---|---|
E608-03 | Paved Waterway, Type 3 (Concrete and Rubble) | 5/2024 |
E608-04 | Paved Waterway, Type 4 (Concrete) | 5/2024 |
E608-05 | Paved Waterway, Type 5 (Asphalt) | 5/2024 |
| 609 | Curb and Gutter | Date |
|---|---|---|
E609-01 | Curbs | 5/2024 |
E609-02 | Granite Curb | 5/2024 |
E609-03 | Concrete Wheelstop | 5/2024 |
| 610 | Sidewalks, Pads, and Medians | Date |
|---|---|---|
E610-01 | Concrete Sidewalk | 5/2024 |
E610-02 | Asphalt Concrete Sidewalk | 5/2024 |
E610-05 | Accessibility Ramp Curb Return | 5/2024 |
< Section Start | Top
| 619 | Fence, Gates, Cattle Guards and Bollards | Date |
|---|---|---|
E619-01 | Fence, Split Rail, 7-Rail Height | 6/2024 |
E619-02 | Fence, Barbed Wire | 6/2024 |
E619-03 | Wood Bollard | 6/2024 |
E619-04 | 16 FT and 28 FT GatesNote: 3 sheets | 6/2024 |
E619-06 | Metal Gate, 30 Feet | 6/2024 |
E619-07 | Residential Chain Link Fence and GateNote: 2 sheets | 6/2024 |
E619-09 | Chain Link Fence and GateNote: 2 sheets | 6/2024 |
E619-11 | Post and Chain | 6/2024 |
E619-12 | Wood Stockade Fence | 6/2024 |
E619-13 | Metal Gate with Breakaway Supports, 26-Foot WidthNote: 2 sheets | 6/2024 |
< Section Start | Top
| 620 | Stone Masonry | Date |
|---|---|---|
E620-01 | Stone Masonry Headwalls for Small Pipe Culverts | 6/2024 |
E620-03 | Stone Masonry Guardwall Terminal Section, Type BAT | 6/2024 |
E620-50 | TL-2 Stone Masonry Guardwall, Double-FaceNote: 2 sheets | 6/2024 |
| 621 | Monuments and Markers | Date |
|---|---|---|
E621-01 | Right-Of-Way Marker | 6/2024 |
| 626 | Plants, Trees, Shrubs, Vines, and Groundcovers | Date |
|---|---|---|
E626-01 | Trees and Shrubs Planting Methods | 6/2024 |
| 628 | Temporary Stream Diversions | Date |
|---|---|---|
E628-01 | Temporary In-Stream Diversion Berm Methods | 5/2024 |
E628-02 | Bypass Pumping For Temporary In-Stream Diversions | 5/2024 |
E628-03 | Floating Turbidity Curtains | 5/2024 |
| 629 | Rolled Erosion Control Products and Cellular Confinement Systems | Date |
|---|---|---|
E629-01 | Slope Stabilization with Rolled Erosion Control Product (RECP) | 5/2024 |
E629-02 | Ditch Stabilization with Rolled Erosion Control Product (RECP) | 5/2024 |
E629-03 | Pipe Inlet Stabilization with Rolled Erosion Control Product (RECP) | 5/2024 |
| 633 | Permanent Traffic Control | Date |
|---|---|---|
E633-01 | Sign Structures | 6/2024 |
E633-02 | Breakaway Sign Support Corrosion Resistant Steel | 6/2024 |
E633-03 | Breakaway Sign Support Wood and Steel Posts | 6/2024 |
E633-04 | Sign Bracing | 6/2024 |
E633-05 | Folding Sign Connections | 6/2024 |
| 634 | Permanent Pavement Markings | Date |
|---|---|---|
E634-01 | Pavement Markings Symbols and Words | 6/2024 |
E634-02 | Raised Pavement Markers | 6/2024 |
E634-03 | Pavement Markings with and without Raised Pavement Markers | 6/2024 |
E634-04 | Pavement Markings in Neutral Areas (with and without Raised Pavement Markers) | 6/2024 |
E634-05 | Pavement Markings and Signing in Parking Areas | 6/2024 |
E634-06 | Pavement Markings, Pedestrian CrosswalkNote: 2 sheets | 6/2024 |
< Section Start | Top
< Section Start | Top
| 636 | Traffic Signal, Traffic Counter, Lighting, and Electrical Systems | Date |
|---|---|---|
E636-01 | Inductive Loop Single Loop Per Lane | 6/2024 |
E636-02 | Inductive Loop Dual Loops Per Lane | 6/2024 |
E636-03 | Inductive Loop Installation | 6/2024 |
E636-04 | Inductive Loop Pull Box | 6/2024 |
E636-05 | Pull Box and Cabinet Location | 6/2024 |
E636-06 | Traffic Counter Cabinet with 10'-0" or 6'-0" Solar Panel Mounting Heights | 6/2024 |
E636-07 | Traffic Counter Cabinet with 4'- 6" Solar Panel Mounting Height | 6/2024 |
E636-08 | Traffic Counter Cabinet Wiring Diagram | 6/2024 |
E636-09 | Traffic Counter Cabinet Terminal Block Wiring Diagram | 6/2024 |
< Section Start | Top | Jump to Section: 252 – 604 – 610 – 619 – 629 – 635 – 636
E157-01
Stabilized Construction Exit