Appendix B: Detailed Tables of Project Costs Summaries

Table 4: Number and Cost of 2014 Projects by Improvement Category

Improvement Category Number of Projects Total Cost of Projects* Average Total Cost* Total HSIP Cost of Projects* Average HSIP Cost*
Access management 44 $32,141,704.64 $730,493.29 $15,956,142.85 $469,298.32
Advanced technology and ITS 32 $97,248,822.63 $3,039,025.71 $21,541,018.47 $742,793.74
Alignment 59 $60,497,797.52 $1,025,386.40 $40,080,788.75 $703,171.73
Animal-related 3 $4,734,751.00 $1,578,250.33 $3,657,000.00 $1,219,000.00
Interchange design 40 $224,660,024.70 $5,616,500.62 $39,537,728.17 $1,129,649.38
Intersection geometry 379 $368,313,376.72 $971,803.10 $244,373,603.90 $655,157.12
Intersection traffic control 505 $339,054,528.95 $676,755.55 $254,780,379.68 $516,795.90
Lighting 40 $48,448,386.46 $1,211,209.66 $25,203,935.82 $630,098.40
Miscellaneous 74 $52,228,356.64 $705,788.60 $43,862,898.71 $609,206.93
Multiple 2 $2,349,200.00 $1,174,600.00    
Non-infrastructure 148 $83,350,652.89 $563,180.09 $74,068,505.79 $510,817.28
Parking 2 $1,017,607.00 $508,803.50 $925,456.00 $462,728.00
Pedestrians and bicyclists 118 $57,247,653.74 $485,149.61 $47,472,978.18 $402,313.37
Railroad grade crossings 13 $5,869,460.99 $451,497.00 $4,952,235.72 $380,941.21
Roadside 303 $231,469,904.15 $763,927.08 $190,975,246.19 $647,373.72
Roadway 722 $672,907,191.64 $934,593.32 $359,546,430.98 $502,862.14
Roadway delineation 160 $117,859,258.55 $736,620.37 $87,687,250.88 $548,045.32
Roadway signs and traffic control 185 $58,007,161.69 $318,720.67 $56,629,838.53 $307,770.86
Shoulder treatments 193 $377,927,662.76 $1,958,174.42 $213,551,495.45 $1,106,484.43
Speed management 3 $208,139.00 $69,379.67 $193,139.00 $64,379.67
Work Zone 14 $3,360,560.30 $240,040.02 $2,928,060.04 $209,147.15
Unknown 227 $161,027,919.77 $709,374.10 $28,641,673.00 $201,701.92
Total 3266 $2,999,930,121.74 $921,071.58 $1,756,565,806.11 $563,001.86

* Not all states provided cost data for all projects in a given improvement category.

Table 5: Number and Cost of Projects by Subcategory for Intersection Geometry

Subcategory Number of Projects Total Cost
Auxiliary lanes – add left-turn lane 92 $98,150,952
Auxiliary lanes – add right-turn lane 19 $19,872,036
Auxiliary lanes – other 99 $76,545,136
Intersection geometrics – modify skew angle 20 $10,303,433
Intersection geometrics – other/unknown 136 $153,260,723
Intersection geometrics – realignment to improve offset 13 $10,181,097
Total 379. $368,313,377

Table 6: Number and Cost of Projects by Subcategory for Intersection Traffic Control

Subcategory Number of Projects Total Cost
Intersection flashers and signing 65 $9,448,113
Intersection traffic control – other/unknown 117 $57,210,865
Modify control to roundabout 70 $95,532,287
Modify traffic signal 219 $152,114,801
Modify traffic signal timing or phasing 27 $22,653,219
Pavement markings 7 $2,095,244
Total 505 $339,054,529

Table 7: Number and Cost of Projects by Subcategory for Pedestrians and Bicyclists

Subcategory Number of Projects Total Cost
Install or modify crosswalk 23 $11,820,499
Install or modify pedestrian signal 31 $13,852,377
Install sidewalk 20 $9,097,960
Miscellaneous pedestrian and bicyclist improvements 44 $22,476,818
Total 118 $57,247,654

Table 8: Number and Cost of Projects by Subcategory for Roadway

Subcategory Number of Projects Total Cost
Pavement surface

112

$122,611,934

Roadway – other/unknown

201

$178,355,380

Roadway narrowing (road diet, roadway reconfiguration)

9

$5,429,806

Roadway widening

38

$160,398,356

Rumble strips

344

$200,617,348

Superelevation / cross slope 18

$5,494,367

Total 722 $672,907,192

Table 9: Number and Cost of Projects by Subcategory for Non-Infrastructure

Subcategory Number of Projects Total Cost
Data/traffic records 38 $8,918,041
Educational efforts/outreach 21 $12,449,466
Enforcement 8 $8,855,806
Non-infrastructure – other/unknown 30 $15,477,797
Road safety audits 15 $2,299,779
Training and workforce development 2 $848,098
Transportation safety planning 34 $34,501,667
Total 48 $83,350,653