FHWA Research Projects Search
Displaying 921 - 940 of 1071
Project Name Sort descending | FHWA AMRP Program | Project ID | Status | Start Date | End Date |
---|---|---|---|---|---|
Small Business Innovation Research: 3-66 Signal Transition Logic - Phase II | Transportation Systems Management and Operations | FHWA-PROJ-09-0130 | Completed | ||
Small-Scale Viscoelastic Continuum Damage (VECD) Protocol | Pavements and Materials | FHWA-PROJ-12-0040 | Completed | ||
Smart Pavement Monitoring System | Pavements and Materials | FHWA-PROJ-09-0094 | Completed | ||
Smart Phone Based In‐Vehicle Driver Warnings for Pedestrian Mid‐Block Crossings | Automation and Connectivity | FHWA-PROJ-17-0025 | Completed | ||
Smart Scour Countermeasures | Geotechnical and Hydraulics | FHWA-PROJ-11-0103 | Completed | ||
Smartphone-Based In-Vehicle Driver Warnings for Pedestrian Midblock Crossings | Automation and Connectivity | FHWA-PROJ-17-0009 | Completed | ||
Solar Roadways | Pavements and Materials | FHWA-PROJ-11-0195 | Completed | ||
Source Heights Data/REMELs Research | Modeling and Analysis Tools | FHWA-PROJ-19-0051 | Active | ||
Spectrum Policy Analysis Based on Testing Results | Transportation Systems Management and Operations | FHWA-PROJ-15-0012 | Completed | ||
Speed Harmonization Fundamental Research | Automation and Connectivity | FHWA-PROJ-13-0100 | Proposed | ||
Speed, Signature, Acceleration and Jerk - Loop Sensor | Transportation Systems Management and Operations | FHWA-PROJ-09-0131 | Completed | ||
Speed-Limit Sign Spacing Study | Safety Design and Operations | FHWA-PROJ-06-0046 | Completed | ||
Splice Length Behavior of Lightweight High-Performance Concrete (LWHPC) | Structures | FHWA-PROJ-07-0052 | Completed | ||
Splice Length of Prestressing Strand in Field-Cast Ultra-High Performance Concrete Connections | Structures | FHWA-PROJ-12-0106 | Completed | ||
Standardized Methods Lifecycle Cost Analysis | Pavements and Materials | FHWA-PROJ-09-0058 | Completed | ||
Standards and Governance for Enterprise Geospatial Systems in Transportation | Modeling and Analysis Tools, Performance Based Planning, Planning for Bicycle and Pedestrian Safety, Connectivity, and Multimodal Mobility, including for Underserved Communities | FHWA-PROJ-18-0006 | Completed | ||
State of the Practice - Evaluating and Quantifying the Benefits of Noise Abatement Measures: Literature Review and Synthesis with Analysis Framework | Modeling and Analysis Tools | FHWA-PROJ-19-0072 | Completed | ||
State of the Practice--Project-Level Noise Analysis on Multimodal Projects: Synthesis and Case Studies | Accelerating Project Delivery, Modeling and Analysis Tools | FHWA-PROJ-19-0057 | Completed | ||
Steel Bridge Coatings Topics | Structures | FHWA-PROJ-13-0040 | Completed | ||
Steel Bridge Testing Program | Structures | FHWA-PROJ-06-0047 | Completed |