Design Book Index
Rev: Jul-2018
Index for Design Book with typical items included in each section.
Rev: Jul-2018
Index for Design Book with typical items included in each section.
Revised: 15-Nov-2024
PS&E Assembly and ReviewTo be completed prior to project Signoff.
Note: This form is not viewable within a web browser. Download the document for viewing and use.
Revised: 26-Mar-2025
The documents and conditions included in this checklist must be met prior to forwarding PS&E package to Acquisitions after Signoff. The first page contains a summary of the Signoff documents.
Open the archive version of the PDF (i.e. filename ends with "_archive.pdf")
Select Comment from the Tools shortcut.
Open PDF containing review comments
If deadline date was NOT established:
Select Check for New Comments
The FHWA-CFLHD is proposing refinements to how its Permanent Stormwater Management Design Process is implemented. This section aims to document the permanent Stormwater Design process so that projects can consistently evaluate stormwater BMPs during project development.