Signoff Package Checklist
Revised: 26-Mar-2025
The documents and conditions included in this checklist must be met prior to forwarding PS&E package to Acquisitions after Signoff. The first page contains a summary of the Signoff documents.
Revised: 26-Mar-2025
The documents and conditions included in this checklist must be met prior to forwarding PS&E package to Acquisitions after Signoff. The first page contains a summary of the Signoff documents.
Open the archive version of the PDF (i.e. filename ends with "_archive.pdf")
Select Comment from the Tools shortcut.
Open PDF containing review comments
If deadline date was NOT established:
Select Check for New Comments
The FHWA-CFLHD is proposing refinements to how its Permanent Stormwater Management Design Process is implemented. This section aims to document the permanent Stormwater Design process so that projects can consistently evaluate stormwater BMPs during project development.
The Contract Inspector Handbook provides technical guidance and explains potential Contract Inspector duties. It outlines common professional relationships, expected communication skills, limitation of authority, required equipment, and methods of record-keeping.
Run text recognition in plan sheet files to make the tabulations searchable. Files created from Word or Excel do not need this step.
The PS&E Plan Review Process consists of the following steps: