USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

U.S. Department of Transportation U.S. Department of Transportation Icon United States Department of Transportation United States Department of Transportation
Turner-Fairbank logo
OFFICE OF RESEARCH, DEVELOPMENT, AND TECHNOLOGY AT THE TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

Validation of Performance-Based Design-Phase 2

Project Information

Project ID:
FHWA-PROJ-20-0029
Project Abstract:

Performance-based design (PBD) is a renewed approach for project decision-making to specifically address the purpose and needs of projects by providing design flexibility. A PBD approach may be implemented for specific long- and short-term performance goals of a project, a whole corridor, or the overall system. PBD is not limited to geometric design elements; it spans project planning decision-making to identify the type of facility, to selection of design volumes, to design speed, and even to the selection of pavement materials and thickness.

Validation of PBD will consist of comparing safety surrogates observed in study/control sites and determining if PBD sites experienced equal or lower safety performance than control sites that comply with design standards. Time series data available in the Strategic Highway Research Program 2 Naturalistic Driving Study (SHRP2) NDS Trips database provide vehicle kinematic measures at different points (in time and location) that will be linked to the curved roadway segment geometric elements (radius, lane/shoulder width). These kinematic measures will then be used as safety surrogates to determine safety performance based on thresholds of observed behavior, frequency, distribution, and risk. Additionally, SHRP2 NDS event data will be collected for every site to evaluate crashes and near-crash events. Observed crash data from corresponding jurisdictions will also be collected for the sites under study. The different sources of data (trips, events, and observed crashes) will be used to conduct separate statistical analyses based on the properties and probability distribution of the data to quantify the difference in safety performance between sites with PBD criteria and conventional design standards.

 

Project Status:
Active
Project Funding Amount (Contract Award Amount):
$315,140.00
Start Date:
End Date:
Public Access Plan:
Yes
Laboratory:
Grant/Contract ID:
  • 693JJ320F000095
FHWA Program Area:
  • Safety
Fiscal Year / AMRP Program / AMRP Activity:
  • FY 2002-2022 / Safety / Safety Design and Operations
FHWA Activity:
  • Naturalistic Driving Study Pooled Fund

AMRP = Annual Modal Research Plan

Contact Information

First Name:
Charles
Last Name:
Fay
Phone Number:
(202) 493-3336
Email Address:
Team:
Safety Data and Analysis Team
Office:
Office of Safety and Operations Research and Development
Office Code:
HRSO-20

Management Organizations

Sponsor Organization

Organization Role:
Sponsor Organization
Organization:
Federal Highway Administration: Office of Research, Development and Technology - Office of Safety and Operations Research and Development

Performing Organization

Organization Role:
Performing Organization
Organization:
Battelle Memorial