USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

U.S. Department of Transportation U.S. Department of Transportation Icon United States Department of Transportation United States Department of Transportation
Turner-Fairbank logo
OFFICE OF RESEARCH, DEVELOPMENT, AND TECHNOLOGY AT THE TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

System Performance Measurement Using Loop Infrastructure, Iteris-Phase II: Product Development (102FH2-05)

Project Information

Project ID:
FHWA-PROJ-10-0086
Project Abstract:

The objective of this project is to develop an inductive loop-based technology for monitoring the travel time and origin-destination performance of vehicles that augments a Bluetooth-based travel time system now under development. To their advantage, loop signatures characterize almost 100% of the vehicles traveling over them while Bluetooth technology characterizes none of them. Bluetooth always correctly reidentifies vehicles while loops may mismatch or miss signature matches. Research findings during Phase I of this project have led the research team to conclude that it is feasible to use 60 Hz samples from single loop detectors in order to perform reidentification between loop detector stations on freeways. The method employed was robust to loop calibration errors, easily corrects for metadata concerning the exact location of the loops, and demonstrated that it was possible to reidentify vehicles up to 1.5 miles away (which was the extent of our test section). This project proposes to productize this research by implementing the software in the commercial archive data management systems, PeMS. We will then perform large field tests of this methodology in both a congested, urban area as well as in a rural area in order to demonstrate its effectiveness over a variety of conditions. These tests will be done on live freeways with the support of California Department of Transportation (Caltrans).

Research HUB ID:
7873
Project Status:
Completed
Project Funding Amount (Contract Award Amount):
$745,000.00
Start Date:
End Date:
Public Access Plan:
No
FHWA Program Area:
  • Small Business Innovation Research
Fiscal Year / AMRP Program / AMRP Activity:
  • FY 2002-2022 / Operations / Transportation Systems Management and Operations
FHWA Activity:
  • Intersections
Project Outputs:

This Phase I project was successful and established the possibility of obtaining travel time data using high-frequency conventional loop data. A Phase II followup project was recommended. May 12, 2014. The project successfully demonstrated that it was possible to collect travel time data similar to Bluetooth data using existing loop detectors and modified signal controller software. The project reports are being reviewed to determine if a Phase IIb commercialization project should be recommended.

AMRP = Annual Modal Research Plan

Contact Information

First Name:
Peter
Last Name:
Huang
Phone Number:
(202) 493-3484
Email Address:

Management Organizations

Sponsor Organization

Organization Role:
Sponsor Organization
Organization:
Federal Highway Administration: Office of Research, Development and Technology - Office of Safety and Operations Research and Development
Contact Role:
Project Lead

Managing Organization

Organization Role:
Project Managing Organization
Organization:
Federal Highway Administration: Office of Research, Development and Technology - Office of Safety and Operations Research and Development
Contact Role:
Project Contact

Performing Organization

Organization Role:
Performing Organization
Organization:
SAIC

Partners and Other Sponsor/Managing/Performing Organizations

Organization Role:
Other
Organization:
U.S. Department of Transportation: Pipeline and Hazardous Materials Safety Administration (PHMSA)