USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

U.S. Department of Transportation U.S. Department of Transportation Icon United States Department of Transportation United States Department of Transportation
Turner-Fairbank logo
OFFICE OF RESEARCH, DEVELOPMENT, AND TECHNOLOGY AT THE TURNER-FAIRBANK HIGHWAY RESEARCH CENTER

Countermeasures to Hand-Emplaced Attack Methods on Steel Bridge Members

Project Information

Project ID:
FHWA-PROJ-13-0044
Project Abstract:

From field evaluation reports, the project will inventory bridge members and Hand-Emplaced Improvised Explosive Devices (HEIEDs) modes of attack. The project will list and provide a rating for existing or recommended HEIED retrofit measures of two kinds: Access Control and Blast/Cutting Mitigation.  For each member, the project will establish performance requirements for HEIED countermeasures and assess retrofit upgrade options. The project will develop and test selected retrofit upgrade options. Finally, it will develop material and design specifications, a Process Control Manual, and recommendations for effective field implementation of these methods.

Goals:

  • Establish the performance requirements for two types of countermeasures to Hand-Emplaced Improvised Explosive Devices (HEIEDs): Access Control Devices and Blast/Cutting Mitigation Components.   
  • Develop research program recommendations (Development and Testing) for improving countermeasure performance in the following areas: Access Control Devices and Blast/Cutting Mitigation Components.
  • Develop recommendations for implementation of access control and blast/cutting mitigation for HEIEDs, which includes methods currently available and those improvements developed under this research.

 

Research HUB ID:
7636
Project Status:
Programmed
Project Funding Amount (Contract Award Amount):
$0.00
Start Date:
End Date:
Public Access Plan:
No
FHWA Program Area:
  • Infrastructure
Fiscal Year / AMRP Program / AMRP Activity:
  • FY 2002-2022 / Infrastructure / Long-Term Infrastructure Performance

AMRP = Annual Modal Research Plan

Contact Information

Team:
Structural Engineering Team
Office:
Office of Bridges and Structures
Office Code:
HIBS-10

Management Organizations