General
Geotechnical Research Team
The geotechnical research team is currently comprised of one full-time Federal staff member, with additional full-time contract staff members, and other supplementary technical support as needed. In addition, the team occasionally hosts interns, postdoctoral fellows, and researchers on...
Geotechnical Laboratory Publications
The Geotechnical Research Team continually publishes its research results in Federal Highway Administration (FHWA) reports, conference proceedings, and journal articles. ...
Current Program
The Geotechnical Research Program conducts applied research to solve transportation-related problems with the aim of building a transportation infrastructure that is economical, safer, and longer lasting. Many projects are conducted in-house in our state-of-the-art laboratories; the Federal...
Geotechnical Laboratory Overview

Laboratory...
Motorcycle Crash Causes and Outcomes: Pilot Study (PDF)
In 2010, the National Highway Traffic Administration (NHTSA) concluded a feasibility study of the Organization for Economic Co-operation and Development data collection protocol for use in the United States. This effort was designed as the precursor to the larger Motorcycle Crash Causation Study...
Tours and Meetings
Tours of the Turner-Fairbank Highway Research Center (TFHRC)
Take a Tour
Virtual Tour:
Take a...
Visiting Turner-Fairbank Highway Research Center
Take a Tour
Take a Tour
Virtual Tour:
Take a virtual tour...