USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

U.S. Department of Transportation U.S. Department of Transportation Icon United States Department of Transportation United States Department of Transportation

General

Legacy ID
431

Right-of-Way and Utilities Support

The Right-of-Way & Utilities office is responsible for the administration of acquisition and relocation activities on federal or federally-assisted projects and programs. The office also serves to identify and resolve utility conflicts that occur when accommodating public utilities on...

Materials

The following resources are related to the quality management and analysis of construction materials.

  • QL Pay - Quality Level and Pay Factor Analysis (QL Pay) is used to track Materials accepted on a statistical basis.
  • ...

Highway Design Resources

The Highway Design sections develop the geometric roadway design and create the project Plan, Specification, and Estimate (PS&E) package.

  • Library - other manuals and resources used in Highway...

FP-14

 

The Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects (FP-14) was issued in 2014 replacing the FP-03.  Currently it is being superseded by the FP-24.

State Standard Drawings

See the state links below for available standard drawings. Drawings are available in various formats including PDF (Acrobat), DGN (MicroStation Design File), DWG and DXF (AutoCAD Drawing), and other image types (TIF, DPR). Standard Drawings are not currently available for download from the...

Estimates, Bidding, and Progress Payments

The following resources provide information about preparing Engineer's Estimates, Bidding, Award, and Progress Payments and Document Management during Construction for FLH projects.

EEBACS

The Engineer Estimating, Bidding, Award and Construction System...

Pay Items (FP-14)

Last Changed: 29-Apr-2025

Related Information FLH Pay Item Request Form Pay Item Request Deadlines Pay Item Listing Pay ItemItem Description - METUnit_mItem Description-USCUNIT_EBid_DecPay_DecPay Item TypeChangedComments 15101-0000MobilizationLPSMMOBILIZATIONLPSM03N...

FLH Pay Item Request

Rev: 31-Jul-2023

Note:  This form is not viewable within a web browser.  Download the document for viewing and use.