WFL Incentives & Adjustments
Revised: 26-Jun-2024
Revised: 26-Jun-2024
Revised: 11-Sep-2009
The Engineer's Estimate Documentation Samples show how to document the unit price analysis.
Revised: 23-Apr-2024
Calculates incentives and asphalt / fuel adjustments for FP-24 and FP-14 projects
Revised: 05-09-2023
Use this spreadsheet tool for estimating major items of work.
NOTE: The CFL FP24 Engineer's Estimate Manual is posted for information only and should not be used on active projects.
Revised: July 2024
CFL Engineer's Estimate ManualThe objective of this Manual is to provide a guide to the Central Federal Lands standard...
The CFL Engineer's Estimate Manual describes the standard procedure for preparation, review, and updating of the engineer's estimate.
The WorkSet contains project specific information and the Sheet Index. The variables used in the WorkSet are common throughout FLH.
New WorkSpace Tips: Things to look out for when using a new WorkSpace...
FLH WorkSet:...
The Working 2D cell library (Work_dd.cel) is the default cell library for WFL. Some cells are located in the FLH-Cells library. The cell library is available with the WorkSpace Downloads.
Categories Sheet Annotation graphics for plan sheets Symbols miscellaneous symbols...The Property.cel library contains symbols used by Survey and Mapping for placing existing property information. The cell library is available with the WorkSpace Downloads.
C16CF 16th Corner Found C16CP 16th Corner Projected C16EWF 16th Corner EW Found C16EWP...