USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

U.S. Department of Transportation U.S. Department of Transportation Icon United States Department of Transportation United States Department of Transportation
FHWA Highway Safety Programs

Safety Eligibility Letter B-106

Hardware Type:
Longitudinal Barriers and Bridge Rails
Code:
B-106
Date:
Testing Criteria:
NCHRP 350
Manufacturer:
Caltrans
Device Description:
Thrie-beam transition @TL-4
View PDF:
b106.pdf (375.15 KB)

September 5, 2002

HSA-10/B106

Mr. Rich Peter, Chief
Roadside Safety Technology Branch
Materials Engineering and Testing Services
5600 Folsom Boulevard
Sacramento, CA 95819-4612

Dear Mr. Peter:

In your July 9 letter to Mr. Frederick G. Wright, former Program Manager for FHWA's Office of Highway Safety, you requested formal acceptance of a Thrie-beam bridge rail transition design that you developed and tested to NCHRP Report 350 test level 4 (TL-4).  You noted in your letter that local FHWA acceptance had been granted and included copies of your May 2002 test report “Vehicular Crash Tests of a Nested Thrie-Beam Transition Barrier and crash test videotapes.

The final design consisted of a standard 4130-mm long section of nested Thrie-beam on the traffic side and a single section of Thrie-beam on the field side of the transition. One of the traffic side nested rails was 10-gauge.  The other nested rail and the backside rail were both 12-gauge material.  A 10-gauge transition piece was used between the Thrie-beam and the approach W-beam guardrail, and the next 2211-mm long section of W-beam was also 10-gauge material.  Six 250 mm x 250 mm wood posts on 953-mm centers were used to support the transition.  The five posts nearest the vertical concrete parapet (with a 125-mm chamfer on its leading edge) were 2440-mm long.  The sixth large post, at the W-beam to transition piece location, was 1830-mm long. These details are shown in the enclosure.

Three tests were successfully conducted on this design:  the 2000-kg pickup truck impacting at a nominal speed of 100 km/h and at 25 degrees with the vehicle centered on the concrete parapet and again with it impacting just upstream from the W-beam to Thrie-beam transition piece, and the 8000-kg single unit truck impacting at 75.5 km/h and 16 degrees approximately 2 m from the concrete parapet.

Based on staff review of the information you provided, I agree that the transition described above meets all evaluation criteria for an NCHRP Report 350 bridge rail transition at test level 4 (TL-4) and it may be used on the National Highway System.  Since it is a non-patented design, I assume that any agency interested in detailed drawings or test results may contact you directly at rich_peter@dot.ca.gov or by telephone at (916) 227-7257.

Sincerely yours,

(original signed by Carol H. Jacoby)

Carol H. Jacoby, P.E.
Director, Office of Safety Design

Enclosure