Archived Hardware Eligibility Letters – NCHRP 350
These letters are archived and are posted for "historical and research purposes only" per the sunset dates in the AASHTO/FHWA Joint Implementation Agreement and exceptions to these dates as posted on the AASHTO Committee on Design website.
Letter | Date Sort ascending | Testing | Manufacturer | Hardware Type | Device Description |
---|---|---|---|---|---|
B-88E | NCHRP 350 | Safence | Longitudinal Barriers and Bridge Rails | TL-4 four cable tensioned barrier | |
SS-151 | NCHRP 350 | SHUR-TITE Products | Sign Supports, Mailboxes, and Delineator Posts | Mailbox Support | |
CC-78D | NCHRP 350 | Energy Absorption Systems, Inc. | Barrier Terminals and Crash Cushions | Safe-Stop trailer TMA | |
CC-57B | NCHRP 350 | Energy Absorption Systems | Barrier Terminals and Crash Cushions | QUADGUARD Elite system 8 bays | |
B-177 | NCHRP 350 | TGS Trinity Industries | Longitudinal Barriers and Bridge Rails | Trinity Guardrail Systems (T-31 and T-39 in both US and SI panels and post spacings.) | |
CC-35H | NCHRP 350 | Energy Absorption Systems | Barrier Terminals and Crash Cushions | modification to QUADGUARD system | |
B-161 | NCHRP 350 | NYSDOT | Longitudinal Barriers and Bridge Rails | Generic 4-strand cable barrier system | |
SS-128 | NCHRP 350 | Northwest Pipe Company | Sign Supports, Mailboxes, and Delineator Posts | Poz Loc Slipbase Casting 2709 | |
CC-99 | NCHRP 350 | Impact Absorption | Barrier Terminals and Crash Cushions | U-MAD trailer-mounted attenuator | |
SS-150 | NCHRP 350 | Northwest Pipe Company | Sign Supports, Mailboxes, and Delineator Posts | Poz-Loc 8 inch square slip base |