Flooded Pavement Assessment Methods
Project Information
This project will determine the optimum time to reopen pavements to traffic after floods, when emergency and repair vehicles can be allowed back on pavements, and the long-term effects of these vehicles on long-term pavement performance.
Goals:
The objectives of this project are to determine the best time to open pavements after floods and to develop models for long-term effects of floods on pavement performance and life.