Develop Concept of Operations and High-Level Requirements for the Dynamic Mobility Application (DMA) Freeway Bundle Integrated Network Flow Optimization (INFLO)
Project Information
This project aims to conduct the foundational research and to prepare for the development and field testing/demonstration identification of an integrated network flow optimization (INFLO). The INFLO bundle consists of the following high-priority applications: queue warning (Q-WARN); dynamic speed harmonization (SPD-HARM); cooperative adaptive cruise control (CACC).
Goals
The key project objective is to conduct the foundational analysis and design necessary to fully prepare for a field test/demonstration of an INFLO.
For more information, see Concept Development and Needs Identification for Intelligent Network Flow Optimization (INFLO).
- DTFH61-06-D-01007
- Operations
- FY 2002-2022 / Operations
AMRP = Annual Modal Research Plan