Design and Construction of Geosynthetic Reinforced Soil (GRS) Structures for Load-Bearing Applications: Part 1
Project Information
This project will pull together 40 years of research and in-service structures to develop the guidelines that can be used for deployment in the Federal Highway Administration's (FHWA's) Every Day Counts (EDC) initiative.
Goals:
The main objective of this research is to develop design and construction guidelines for the Geosynthetic Reinforced Soil Integrated Bridge System (GRS-IBS).
- Infrastructure
- FY 2002-2022 / Infrastructure / Geotechnical and Hydraulics
- Geotechnology Research Program
Geosynthetic Reinforced Soil Integrated Bridge System (GRS-IBS) Interim Implementation Guide. [Source: FHWA, PMSS Database (2013)]
AMRP = Annual Modal Research Plan